From the first panel to the last seam test.
A lining system is only as good as its installation. Our installation crews deploy, weld and supervise geosynthetic construction using calibrated equipment, with quality control built into every panel.
From heap leach pads and landfill cells to reservoirs and water features, every seam is tested and documented before handover.
What we deliver
- Deployment & anchoringPanel layout, deployment and anchor trenches set out to the design drawings.
- Certified weldingFusion and extrusion welding by certified welders on calibrated welding rigs.
- Seam testingDestructive and non-destructive testing of every seam, with in-process QC.
- QA documentationFull QA records and as-built documentation delivered at handover.
Applications
- Mining
- Heap leach pads, tailings and process ponds.
- Waste management
- Landfill cells and ash yards.
- Water infrastructure
- Embung and water storage reservoirs.
- Commercial & leisure
- Lakes, lagoons and water features.
Products we use
- Solmax
- GSE HD →
- Solmax
- BENTOLINER Enviromat →
- Claynox
- Claynox Geodrain TNC →
- Roxfelt
- Roxfelt Non-Woven →
Gallery





Talk to our team


