← All projects/Mining/Heap Leach Pad II
Heap Leach Pad II — aerial view

Supply & Installation · Completed

Heap Leach Pad II

Heap Leach Pad Lining System

Sector
Mining
Scope
Supply & Installation
System
Heap Leach Pad Lining System
Status
Completed

Containment and drainage across a large leach pad.

The Heap Leach Pad II project features a large-scale lining system engineered for demanding mining operations. Our scope included the supply and installation of GSE HDT Geomembrane and Claynox TNC-302 Geonet, supporting reliable containment and drainage across the extensive pad area.

Completed to meet the scale and performance needs of the project, Heap Leach Pad II demonstrates our capability to deliver robust geosynthetic solutions for major mining infrastructure.

Gallery

Heap Leach Pad Lining System

Enquire about this project